PROJECTS
2007
Arkansas
State Highway and Transportation Department-Pinnacle Hill
Parkway/Horsebarn Road Bridge Project
This $4.9 Million project
involved widening Pinnacle Hills Parkway/Horsebarn Road from 2 to
5 lanes for over 1/2 mile and the construction of a bridge in Rogers,
Arkansas.
Central
Arkansas Transit Authority
CATA-River Rail
Street Car Project Phase II (Little Rock, Arkansas)(CATA)
2005-2007
Mobley conpleted the $5.78
Million Construction project of the River
Rail Streetcar Extension Project-Phase II in
Little Rock, Arkansas. The
.9 mile extension of track links the William Jefferson Clinton Presidential
Library and Heifer International to the existing track in Little
Rock and North Little Rock.
White
River Hydroelectric Power Project in Batesville, Arkansas.
2004-2007
The project
consisted of the complex construction and start up of three turbine
hydroelectric power generating plants on the White River. The
power plants were built and installed within existing lock and dams
on the river that were constructed in the early 1900s.
I-430
and Shackleford Bridge Extrension Project
This schedule
driven project consisted of extending additional lanes on an existing
bridge and interstate ramps crossing a double three lane interstate
(I-430)
in Little Rock, Arkansas. The project was successfully completed
to meet the developers schedule and accomodate for the opening of
the 97 acre West Little Rock's Shackleford Crossing Mall.
Central
Arkansas Transit Authority
(CATA)
$12 Million-Construction
of an electric street car system. The project consists of
installing an Overhead Contact System (OCS) and rail in the downtowns
of Little Rock and North Little Rock, Arkansas. The River
Rail project will bring back the historic street car trolley connecting
major city attractions.
Arkansas
State Highway and TransportationDepartment. (AHTD)
AHTD-Culberhouse
St-Hwy 49 ( Jonesboro , Arkansas)
$6.1 Million- Widening of
2.7 miles of Hwy 63B in Jonesboro , Arkansas . The project consist
of base and surface courses, drainage, realignment of RR Crossing,
traffic signal equipment, and erosion control.
AHTD-Cossatot River
and Relief STRS. $5.2 Million-Construction of a composite
W-Beam Spans Bridge and composite plate girder spans bridge on Hwy
71 crossing the Cossatot River East of DeQueen, Arkansas .
AHTD-Hwy 67-East
STRS. And APPRS $3.9 Million-Replacing (4) existing bridge
structures and approaches on 1.1 miles of Hwy 226, NW of Tuckerman,
Arkansas .
AHTD-Hwy
63-Culberhouse St. ( Jonesboro , Arkansas) $8.7 Million-Widening
of 3.5 miles of Hwy 63B in Jonesboro , Arkansas . The project
consists of base and surface courses, (2) W Beam Bridges, (1) Precast
Box culvert.
AHTD-Alcoa Rd Interchange
(Benton, Arkansas)
$5.0 Million-Upgrade Alcoa
Interchange with improved ramp alignments and the construction of
a new continous stell plate girder bridge over I-30 west of Benton
, Arkansas .
AHTD-Davis Tr.-Willow
ST . (Searcy, Arkansas)
$2.4 Million-Widening 1.1
miles fo Hwy 67 B in Searcy , AR. The project consists of grading,
base/surface courses, triple box culverts, traffic signal equipment,
and erosion control.
AHTD-Maple St.-Hwy
112 S. ( Fayetteville, Arkansas)$1.8 Million-Widen of Hwy
112 in Fayettville, Ar. The project consists of grading, drainage,
base/surface courses, traffic signal equipment, and erosion control.
AHTD-Illionois Bayou
STR. And APPRS. (NW of Dover, Arkansas)
$2.6 Million-Construction
of W- Beam Spans Bridges over the Illinois Bayou NW of Dover , Arkansas.
AHTD-Lamar-Pope
Co. Line (W of Russellville, Arkansas)
$7.1 Million-Construction
of (3) Bridges over Piney Creek, Lamar, and Hwy 359 on I-40 west
of Russelville , Arkansas .
AHTD-Sevier
St.-West of Alcoa Rd (Benton, Arkansas)
$3.8 Million-Construction
fo (2) Steel Plate Girder Bridges over I-30 West of Benton , Arkansas
.
2000
Chemical Demilitarization
Support Facility
US Army Corps of
Engineer
$3.4 million demolition project
at the Pine Bluff Arsenal located in Pine Bluff , Arkansas . The
project consisted of demolition of pumps, gas lines, water lines,
water tanks, and miscellaneous buildings.
1995
Curtis Revetment,
Red River Waterway, Bosier Parish, Louisanna
US Army Corps of
Engineers
$5.1 million construction
of over 4,800 LF of stonefill revetment, 4,100 LF of pile revetment
and dike, and 2550 Lf of stonefill dikes.
1994
Gurley Pit Superfund
Site, Edmondson , Arkansas
US Army Corps of
Engineers
$6.5
million EPA Superfund site cleanup near Edmondson , Arkansas
. The project involved: the remediation of sludge containing oils,
metals, and PCBs; the construction of a RCRA landfill; Solidification
and placement of 20,000 cubic yards of material with the containment
cell; On-site water treatment of surface water; and off-site incineration
of recovered oils.
Mobley
Contractors, Inc. received he U.S. Army Corps of Engineers, Southwestern
Division Construction Contractor of the year Award for the Civil
Works Program.
1990
Water Treatment Plant
Expansion, Benton , Arkansas
City of Benton ,
Arkansas
$4.1 million construction
of a clarifier treating unit, chemical filter building, pumping
stations, waste water basin, carbon feeder building and the installation
of raw water meter associated with the existing water treatment
plant.
|